St Johnsbury Public School

This large K-12 city school had limited space in the boiler room and no easy way to install a dry chip storage silo near it anyway.  So it was decided to build a separate boiler building in an area near the school where it would be reasonably close to the boiler room and have easy access for refilling the silo.

A beautiful brick building was built to match the school’s facade.  A Schmid 1.7 million BTU/hour biomass boiler was installed there with a large buffer tank and 40 ton dry chip silo.  Two existing Buderus oil fired boilers were left in place to act as peaking and back-up roles with the Schmid as primary heat source.

Learn more about our work with the Schools and Institutions Sector

Similar Projects

Campton Elementary School

John Stark High School

Froling Energy
20 Manchester Street
Keene NH 03431
603-924-1001

Copyright © Froling Energy | All Rights Reserved